Skip to main content

Posts

Featured

Water Features and a Bridge: August 27, 2020

Gekko finished the landscaping and Stein and Brede built a bridge over the drainage swale. Putting each potted plant in the ground is tedious, but it is a beautiful day. The headwaters. Working next to the waterfall. Meanwhile, I set up our fountain. The Bridge over the Drainage Swale. After the mulch.

Latest Posts

Plantings:August 26, 2020

Fire and Water: August 25, 2020

Water! August 24, 2020

Engineering a Stream: August 21, 2020

Underground Reservoir: August 20, 2020

Digging a Stream: August 19, 2020

Moved In: August 18, 2020

Blank Slate: August 16,2020

Fire on the Mountain: August 15, 2020

Moving Day: August 14, 2020