Prepping the Site: April 3, 2019

 
The excavator installed erosion control, and the culvert for the temporary driveway.  Temporary electrical hook-up delivered, but not yet installed.  Mt. Werner Water inspected location of water and sewer taps





Comments

Popular Posts