Next phase: October 17, 2019

 
Derrick installs the last window,
 

and we move into new phases.
 
 
Inside, the underfloor with the radiant heating has been installed in the kitchen,

 
the Great Room,
 
 
and the pantry and desk nook.
 
 
Stein has readied the second floor,
with the radiant heat tubing snaking through the Master Bedroom,
 
 
the front hallway,
 
 
and the back hall.
 
 
Meanwhile, Leif and Tanner work outside installing the siding.
 
 