Running the Lines: October 22, 2019

With the radiant heating lines now safely ensconced in the hardened concrete,
it is time for the plumber to run the supply lines
up from where the boiler will eventually be.
 
 
Up to the second floor, through the pantry wall . . .

 
and behind the lockers in the back hallway.


Comments

Popular Posts