Inside: November 14, 2019
While work continued outside on the roofing and shingles,
the gas line installation began.
The gas line comes into the house in the storeroom under the kitchen.
One spur runs under the kitchen to the outside wall for the outdoor grill.
Another runs into the mechanical room for the boiler.
Meanwhile, the ventilation/air conditioning duct work
is being installed in the office upstairs.
The ductwork crosses over above the ceiling.
One leads to the vent in the office.
The other will lead to a vent in the Great Room.
Comments
Post a Comment