Tubs and Mantles: February 4, 2020

As the temperature dropped, work continued.
 
 
Outside, under a tent,
Alberto put the limestone cap on the outside retaining wall.
 
 
Inside, Juan worked on the housing for the humidifier above the first floor closet.

 
And installed the bathtubs in Bath D,

 
and Bath A.
 
 
Derrick tried a sample mantle in the Great Room,

 
and prepared the full-size version for final installation.


Comments

Popular Posts