Beams: February 27, 2020
As the drywalling began to wrap up, time to take stock of the exposed beams.
The beam in the Great Room above the fireplace is uncovered.
Exposed beam in Bath D.
And in the second floor hallway.
Door to laundry chute.
Fireplace on lower level almost done.
Front door being stained.
Joanna, the Great Wall is almost ready.
Comments
Post a Comment