Bathrooms: April 18, 2020

A closer look at the tile and wood trim going in the bathrooms.


Bath G cabinet on lower level.

 

Bath A and Bath D.

 

Master Bath.


Meanwhile the final trim outside has been installed outside.


The back panels still need to be painted.


Front entry.

Comments

Popular Posts