Week's End: April 24, 2020

Good day to assess where we are, 55 weeks after we started.


Ski runs reflected in the front windows.


Two views of the fireplace in the Great Room, at Sue Carrigan's request.


Light fixture in the entry way.


The elevator cab is up there.


Two views of the Great Wall, with the light fixtures in.
 

Sean has been patiently installing the cabinets in the kitchen.


And building the island.  Wine rack on the right.


Upstairs, the fixtures on the back balcony.


Hanging light in the master bath.


Cable installations being completed.


And Bobby put in the tile in Bath D's shower stall.