Update: April 17, 2020

After a month of sheltering in place in Oak Park, we have returned to Steamboat Springs to do our "stay-at-home" there, but also oversee the construction (which is an "essential business" under the Colorado and Routt County orders).

And what progress!


Here is the installation of the cabinets in the kitchen.


Derrick has been working on the stairs.


And framed out the "pirate ship".


In the family room, the cabinets for the "wet bar" are in.


Bob has laid the tile in Bath G on the lower level.


And the second boiler, for the snowmelt driveway, is now in.


Up on the second floor, Bob's tile work is evident.


Almost finished with the horizontal band around the tub in Bath A.
 

Working on the base of the bookshelves on the second floor.


Cabinets are being installed in the master bedroom closet


Stein is installing the wood trim in the master bath.


Comments

Popular Posts