Second Floor Joists: July 1, 2019

 
Making progress, the guys spend the morning making sure that the first floor walls are plumb, then start installing the floor joists for the second floor.
 
 

 
Derrick accepts the 38-foot fabricated joist atop the framing.
 
 
Leif steadies in the middle, halfway up the ladder, while Tanner guides from the end.
 
 
 
Leif pulls the joist into final position.
 

 
Then Derrick and Tanner nail it down.
 

Comments

Popular Posts