Grading: June 1, 2020

Bud returned with his equipment to prepare 
the driveway and sidewalks for concrete.


The culvert has been extended on either end.



 Bud smooths out the grade.
 

Jarle and Stein each lend a hand.


Bud lays down sand and smooths it all out.


Smooth and ready for the concrete.

 Forms are laid for the walkway around the side of the house.


Meanwhile, inside Derrick puts together the ladder into the pirate ship.


"Aargh!"

Comments

Popular Posts