Moving Forward on Several Fronts: June 25, 2020

Cactus is installing the stairway railing.


First, the posts.




Then, the upper and lower rails.


Finally, each vertical is welded into place.



With the countertops and appliances in,
Bobby and Tyler installed the kitchen backsplash.


While Stein prepared the Pirate Ship for its wooden wall.


Comments

Popular Posts