Lights and Driveway Preparations: June 8, 2020
After obtaining replacement cords from the supplier,
Harrison and Oscar re-installed the staircase pendant lights.
First the lights were arranged at varying lengths.
Then it was time to lift the whole set into place.
The results.
It will look even better once the scaffold is removed.
Outside, preparations for the driveway.
First, styrofoam insulation.
Then Juan connected the tubes for the snowmelt.
Stein laid re-bar over the tubes for strength.