Cactus came back to work on the interior railings.
First the posts.
Then the rails.
Meanwhile, Bobby and Tyler worked on the shower and bath tile.
In the Master Bath.
And in Bath D.
Outside, the Gekko crew starts the installation of the irrigation system.
Comments
Post a Comment