Pouring the Foundation: May 10, 2019




It took seven loads of concrete.

 

 The pumper is controlled remotely by the operator.



The concrete truck arrives and maneuvers into position. 
 
 
 
Then the pumper lifts the concrete over the site.
 
 
The concrete fills the void between the forms.


 
 Then the shaker vibrates the concrete to eliminate air bubbles.
 
 
 
 
Stein keeps a close eye on the progress.
 
 
 
The top of the wall is smoothed out.


 
Anchor bolts are installed by sticking them into the wet concrete.
 
 
 
The framing will eventually be screwed down to the top of the concrete wall.













Comments

Popular Posts